| Sign In | Join Free | My chinabagsnet.com |
|
Brand Name : SUSSMAN
Model Number : SS-FD
Certification : CE
Place of Origin : WUXI CHINA
MOQ : 1 set
Price : negotiable
Payment Terms : T/T, L/C
Supply Ability : 10 sets per month
Delivery Time : 65-75 days after deposit
Packaging Details : standard packing
Main Motor Power : 7.5KW
Material Thickness : 1.5-2.0mm
Rolling Stations : About 16 Stations
Way Of Drive : 1.2 inch chain
150mm*150mm Volume Control Fire Damper Roll Forming Machine With Hydraulic Punching
Fire Damper Technical Parameter
| Items | Specifications | |
| Material of coil | Material Thickness | 1.0-1.5 mm galvanized coils |
| Un Coiler | 3 tons hydraulic | |
| Servo feeding | Motor | Delta 1.8kw |
| Punching device | Punching | 4 sets of punching die |
| Forming system | Forming Speed | About 2-3pieces/min |
| Roller Stations | About 16 stations | |
| Roller Material | Gcr15 coated with chrome
| |
| Maim Motor Power | 7.5kw | |
| Motor cutting Power | 5.5kw | |
| Cutting system | Material Of Cutting | CR12mov with quench treatment |
| Hardness | HRC58-62 | |
| Tolerance | +-1.5mm | |
| Cutting blades | 1 set | |
| Electrical control system | Electric Source | 380V, 50HZ,3 phase Also can satisfy Customer’s requirey |
| Control System | PLC Delta as list in the note | |
| Weight | About 8 tons | |
| Way Of Drive | 1.2 inch chain | |
| Machine size | mm | 10000mm*700mm*1000mm |
Fire Damper Main Components
| S.N | Equipment name | Quantity |
| 1. | 5T passive un-coiler | 1 set |
| 2. | Main roll forming machine
| 1 set |
| 3. | Hydraulic cutting | 1 set |
| 4. | Control system (including control box) | 1 set |
| 5. | Punching | 2 sets |
Working Flow of Fire Damper
Decoiler----Feeding---Roll forming---Cutting---Run out tables

Samples

Advantage for Fire Damper
1. Reasonable Price
2. High Quality
3. 12 Months Warranty
4. More Than 10 Years Experience
5. Durable
6. Reliable
After-sale Serive
- The seller take responsibility to installation and commissioning of the equipment and free training. After machine arrive the destination, by the request of the buyer , the seller will provide 1 technical engineer to guide installation and training , and the buyer should give the technical person with full cooperated.
- Installation period: about 5 days after the complete preparation by the buyer such as the foundation and all necessary accessories.
- Training time: 5 days.
- Before departure of the engineers from seller, the buyer should pay for installation and commissioning fee 100$/day to the point account of the seller. The two-way ticket,visa, food, hotel , the translator and insurance are all should provide by buyer with full responsibility.
-The seller supply technical data (including forming mould drawing, electrical elements drawing and equipment drawing etc.)
|
|
150mm*150mm Volume Control Fire Damper Roll Forming Machine With Hydraulic Punching Images |